Training Steps
1. Navigate to your desired Asset where you want to Link your Standard Activity/s
2. Hover the mouse over your asset, click the right mouse button, then select Open (circled in red)
This option will launch the Assets form safs090
3. Select the Std Activities tab button (circled in red)
This option will display the Linked Standard Activities
4. Select the Expand button to expand the standard activity triggering form as per the image below
5. Select the Trigger Date checkbox to turn the tick off (circled in red)
6. Click the Green Tick (accept)
7. Select the Save button to record your information
8. Select the Expand button to expand the standard activity triggering form as per the image below
9. Select the Trigger Code line by clicking the left mouse button on the arrow (circled in red) and press the DELETE key
10. Select the Accept button
11. Select the Save button to record your information
12. Select the row adjacent to the Standard Activity to break the link (circled in red) and press the DELETE key
13. Select the Save button to record your information
14. CLOSE the form by selecting the Windows close option
This action will return you to the Workbench